The Mending Bench

One person, one bench, Galway. Repair notes kept since October 2020.

A tide mark on a 1908 almanac, and the decision to leave it

· job 164 · a 1908 almanac, 15 × 10 cm, paper boards, salt-water staining across the lower third

I did nothing to the staining. That is the whole entry, except for the reasons.

The book

It came from a house in Roscummer with a single line of provenance: "found in a boathouse". The staining runs across the lower third of both boards and follows the lower edge of the text block pages in a clean horizontal line, which tells me the book sat wet in a stack, not wet on its own.

BoardsBoth bent along the stain line, roughly 9 mm of bow over 15 cm
Text blockPages below the line are cockled and stiff; above it, flat and clean
SewingTwo stations, hemp thread. Sound. Slight discolouration at the lower station
What is at riskThe fold at the lower third. The paper there is creased from years of being closed in a bowed shape

The tempting repair

Flatten the boards. Humidify, press, re-shape. It is the obvious job and it is what a beginner would do, and I nearly did it.

Why I stopped

I opened the almanac and flexed it. The bow is doing work: the boards' curve takes up the slack created by the crease at the lower fold. If I flatten the boards, that slack has to go somewhere, and the somewhere is the fold — which is already creased nearly through on two sections.

So the staining is not only damage. It has become part of how this object currently holds itself together. Removing the damage would break the object.

What I did do

Six-month check

Done 27 June 2026. The guard is doing what I wanted. Two of the sections at the lower fold are now supported by the guard rather than by the crease, and the crease has not advanced. Bow unchanged. I consider this entry a success, and a success consisting of almost no work.

Job number 164. The best repair on this bench is sometimes the one you write down and refuse to do.

Bench notes · Previous entry · Next entry